Skip to content

A house being built. Accounts in the open.

HypersKids emblem
Build
The HypersKids house, in Kampala, Uganda
Stage
Block walls and slabs standing in the main block, from the photos received in October 2026
Token
$HYPERSKIDS, on the Solana networkContractToken GwkEDw…wmuyhG (opens in a new tab)
Accounts
$318,633.38 received by the wallet holding the group’s tokens over 231 daysOn-chain 1,260 transactions checked
Front of the main block under construction: bare block walls, a flat slab and brick steps on red earth.
Photograph Main frontreceived Oct 2026

Location, stage and wallet ownership were stated by those responsible for the project. The amounts were checked on-chain on Oct 11, 2026.

From bare land to a house

Eight photographs show the works in Kampala. The 3D model, made from them, helps you see the path: where the build started, how it looks in the photos and what can still be done.

Image of the 3D model: Main block, stage As photographed.
Illustrative 3D model

Drag to rotate. Ctrl + scroll or the buttons zoom.Drag sideways to rotate. Two fingers zoom.

The yellow line is the build’s ruler. Drag the level or tap a stage: the house rises from bare land to the projection. Stage 4 is the one the photographs show.

Part of the compound

As photographed

Based on the photos

Bare blocks and concrete, a raised veranda and brick steps. The visual basis is the photographs provided.

Illustrative 3D model. The finish shown is a possibility, not the approved design of the works.

3D model of the main block with light render, an earth-coloured band and window frames.
3D model of the main block with bare blocks and concrete.
RecordProjection

Drag the plumb line. On the left, the main block as it appears in the photos; on the right, one possible finish. Both images come from the 3D model.

What is record and what is projection

Approximate study
It is a visual study, not a measured survey, BIM model or construction project. The photographs give no measurements, complete floor plan or geographic orientation.
Record
It shows what can be seen in the photos, not a certification of the current state of the works. The land and the earlier stages are illustrative reconstructions, not historical records.
Projection
It shows one possible finish, not a completed building or an approved design. The sequence gives no percentage, budget, deadline, capacity or use of unconfirmed rooms.

The works from eight angles

The photographs were provided by those responsible for the project and received in October 2026. They show a group of buildings and open areas, not a single house, and are not a certification of the current state of the works.

Who the HypersKids are

Hypers Kids Africa is a dance and acrobatics group made up of children from Kampala, the capital of Uganda. A July 2024 article also describes the group as a home that gives 45 children shelter, food, clothing, education and medical care.

That year, at an America’s Got Talent audition, one of the dancers said the group hoped to win in order to buy land and build a house and a school.

Source: My Modern Met, July 10, 2024 (opens in a new tab)

Stated According to those responsible for the project, the building in the photographs on this page is that house.

Video published by the group

The rest is in the other tabs

Accounts
$318,633.38 received by the wallet holding the group’s tokens, in 1,260 transactions checked one by one.Open the accounts
J trace
81 million tokens left the children’s wallet for 7 wallets. Their path, followed through 89 wallets.Open the trace
Token
The contract, what the network shows, the risks and how to buy. Buying is not donating.Open the token
Questions
10 straight answers about the house, the accounts, the trace and the token.Open the questions